CazRail

Llyn Cefni: A section of the Amlwch Branch

42 posts in this topic

Hi matt,

I used textured paint just to get texture, then painted using two shades of grey. Bridge abutments and wingwalls will get similar treatment.

matto21 likes this

Share this post


Link to post
Share on other sites
5 hours ago, matto21 said:

Do you mind me asking which brand of paint? It looks good!

Hi Matt,

It's Rust-oleum Textured paint in Desert Bisque. The bridge only had one quick coat before being painted with Revell grey paints.

HTH

Share this post


Link to post
Share on other sites

Progress...

The second piece of track has been laid on the layout, laid in the same way as the other section. I have also installed dropper wires to feed the track. I've not yet ballasted, this will be an evening project for this week. I've also painted the 'railway land' in dark umber ready for scenics to begin.

 

DSC00319.JPG

DSC00321.JPG

DSC00322.JPG

DSC00323.JPG

DSC00324.JPG

DSC00325.JPG

DSC00326.JPG

DSC00327.JPG

DSC00332.JPG

I also took time to begin painting the stone abutments and wing walls of the bridge in more appropriate colour.

DSC00320.JPG

 

Some bonus content for you, DBC's 66200 on gauging trials on the branch. It fits like a glove through the bridge...

DSC00331.JPG

 

DSC00330.JPG

DSC00329.JPG

DSC00328.JPG

DSC00318.JPG

Chris likes this

Share this post


Link to post
Share on other sites

Right, so this tonight is SWMBO-free, so this evening I will be... ballasting. Y A Y 

Share this post


Link to post
Share on other sites

So tonight has been productive, I've ballasted the layout, only 20% ish of it left, but I'm almost out of Ballast Bond. Also, I've wired it up, and used old Bachmann class 158 lighting connectors to link the two boards. These will be replaced by more permanent units once a third (and possibly a fourth) board is commissioned.

This allowed me to test, and it all worked. I am chuffed as hell with this.

A video will be uploaded to YouTube soon...

Share this post


Link to post
Share on other sites

Stuff ordered today are 2mm static grass mat, 6mm static grass mat, and a fresh bottle of Ballast Bond.

Hopefully some progress once delivered, some time next week.

Share this post


Link to post
Share on other sites

Stuff arrived on Tuesday,  so did some progress.

First and foremost I finished the ballasting. So with that done I cut out some 6mm static grass sheet and put some on. I'm not quite decided, it looks OK I think. Then I made a start on the banking towards the rear of the layout,  by laying another layer of polystyrene sheet which will be sanded to profile. 

20170830_165426.jpg

20170830_165438.jpg

the grass looks OK I suppose, but needs work, like adding a few bushes etc.

Then I decided a photo shoot would help my imagination...

20170830_165626.jpg

Breaking new ground for the class, 67024 takes 'Amlwch Freighter' rail tour to Amlwch Octel. 

20170830_165656.jpg

67024 leads the charter over Llyn CefnI bridge. 

20170830_165849.jpg

While 66200 mans the rear.

20170830_170210.jpg

An Arriva 153 takes the service train to Amlwch. It'll pass the charter in the loop at Llangwyllog.

Comments welcome, especially with the grass!

 

Edited by CazRail

Share this post


Link to post
Share on other sites

The state of play tonight...

20170831_222045.jpg

The back of the board built up. Static grass mat applied along the rear to represent fields/amenity grass land.

20170831_221637.jpg

66200 leading tonight's 7D45 Ellesmere Port to Amlwch Octel Sdgs. 

samw likes this

Share this post


Link to post
Share on other sites

A few small jobs done this weekend. Firstly a strip of 2mm static grass was put along the back of the layout  representing fields. Any white areas was also painted in burnt umber. The only white bit has been newly filled.

20170902_170611.jpg

20170902_170620.jpg

I then made some wing fences for the bridge. I had originally used single sections of Hornby 4 bar post and rail fencing, but it just wasn't prototypical. So I made some put of some plastic strip.

20170902_170632.jpg

20170902_170643.jpg

20170902_170654.jpg

I think these are better, having actually installed these in my job, I'm happy with them. I know they're more Network Rail era, as I'm pretty sure the bridge doesn't have these in (if it was an operational line chances are it would).

So this morning I came home from my night shift, and decided to have a play with some clear silicone sealant to create water...

20170903_143934.jpg

20170903_143947.jpg

20170903_143953.jpg

20170903_143959.jpg

We'll see how it turns out. I know they're not too clear in the photos, but if anyone has any thoughts/ideas let me know.

Thanks for reading 

Share this post


Link to post
Share on other sites

Some proper scenics done this evening,  using woodland scenics stuff. Here's what I did...

20170907_202057.jpg

 

20170907_202104.jpg

20170907_202039.jpg

I'm rather happy to tell the truth. Static grass would improve it but that can wait. I'll do the rest tomorrow. 

Starting to debate whether it needs a backscene. ..

Share this post


Link to post
Share on other sites

Update with better photos...

Scenery on these two boards is now 90% complete, with only the little corner on the corner board now to do. Here's now it looks now...

post-27004-0-69249100-1505057067_thumb.jpg

 

post-27004-0-14380800-1505057107_thumb.jpg

 

post-27004-0-80696300-1505057088_thumb.jpg

 

post-27004-0-41028300-1505057001_thumb.jpg

 

post-27004-0-64541400-1505057037_thumb.jpg

 

To compare two shots of the same view of the layout, here's two shots taken around the same place 'on board a charter'...

post-27004-0-49429600-1504772971_thumb.jpg

 

post-27004-0-07665800-1505057150_thumb.jpg

 

What do you think? I'm quite happy with it, but as usual I've got some patching up to do.

Chris and Jack like this

Share this post


Link to post
Share on other sites

Not much progress lately due to other commitments, however 'man of a boat' has been out on the lake today to photograph the Octel tanks...

20170927_195744.jpg

37703 running to Amlwch with two barrier wagons for a shunting excersise at Amlwch.

20170927_200415.jpg

20170927_200351.jpg

37174 and 37422 take a consignment of chlorine to Ellesmere Port.

Jack likes this

Share this post


Link to post
Share on other sites

Hopefully a week friday ill be able to report progress, my allowence this friday will go towards some "PAB" petroleum coke hopper kits...

Share this post


Link to post
Share on other sites

A bit of progress today, decided to ass to the layout plan by adding a section towards Llangefni to represent the 'Dingle', which is the forrest in llangefni. 

I started progress on this by begining to scratch build a lattice girder bridge, which in real life crosses a river. On my layout, itll cross a river and footpath.

Using styrene sheet cut into strips, i begun to create the sides.

20180415_175001.jpg

20180415_182819.jpg

Using a jig I used to assist in getting the lattice square and paralel, i worked from the centre and worked outward.

20180415_190317.jpg

20180415_190938.jpg

20180415_190956.jpg

Then i made a start on the deck, using plasticard sheet. I used balsawood as strengtheners, which double as the longitudual timbers. 

20180415_195034.jpg

I ran out of u-section for the lattice so Ill need to order some more. Once done, Ill cover the plastic sheet base with boarding or styrene strip to make decking. Then itll be a coat of primer and paint!

samw likes this

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now